Reading

South East·E06000038·Data: 2025 Q1-Q4
62

Average

Performance rating out of 100, based on approval rate, decision speed and appeal outcomes

Reading Borough Council handles planning applications across the town and surrounding areas in the South East. The council approves the vast majority of householder applications, showing a generally supportive approach to home improvements. However, applications do take longer than the target timeframe on average.

Approval Rate

91%

of householder applications approved

Decided Within 8 Weeks

44%

meet the statutory target

Appeal Overturn Rate

24%

of refusals overturned on appeal

What to Expect

You have a very good chance of getting your application approved, with 91% of householder applications succeeding at Reading. The main thing to be prepared for is that decisions tend to take longer than the standard 8 week target, as only around 44% of applications are decided within this timeframe. This means you should plan ahead and not rely on a quick decision. On the positive side, if your application is refused, there is a reasonable chance of success on appeal, with 24% of refused applications overturned.

Local Planning Considerations

Reading has several conservation areas where stricter rules apply to changes on the outside of properties, so check whether your home falls within one of these designated areas before applying. The area also has green belt land surrounding parts of the borough, which can affect what types of development are permitted in those locations. It is worth checking your property's specific location on the council's planning portal to understand any local restrictions.

Tips for Homeowners

Start by spending time on the council's online planning portal to understand what has been approved in your area previously, as this gives you a strong sense of what might work for your property. Make sure your application is as detailed and well presented as possible, because the quality of your submission can influence how smoothly the process goes and may help speed things up. Since decisions often take longer than 8 weeks here, submit your application with a realistic timescale in mind and avoid making time critical decisions based on the standard target date.

About the performance rating: The score out of 100 is calculated from three factors: householder application approval rate (up to 40 points), the percentage of decisions made within the 8-week statutory target (up to 30 points), and the appeal overturn rate, where a lower rate means the authority makes sound decisions that hold up on appeal (up to 20 points). A further 10 points are available for data completeness. Source: MHCLG PS2 planning statistics and Planning Inspectorate appeal decisions, 2025 Q1-Q4.

Does your project need planning permission?

Get an instant answer tailored to your address and project type.

Assess My Project