High Peak

East Midlands·E07000037·Data: 2025 Q1-Q4
52

Average

Performance rating out of 100, based on approval rate, decision speed and appeal outcomes

High Peak is a planning authority in the East Midlands that covers a mix of urban and rural areas with a strong emphasis on local character and heritage. The authority approves the vast majority of householder applications, making it generally receptive to home improvement projects. However, decision timescales can be longer than the standard target, so patience is needed during the waiting period.

Approval Rate

90%

of householder applications approved

Decided Within 8 Weeks

34%

meet the statutory target

Appeal Overturn Rate

42%

of refusals overturned on appeal

What to Expect

You can be fairly confident about your chances here, as High Peak approves around 9 out of 10 householder planning applications. This is an encouraging sign that the authority takes a positive view of most home improvement proposals. On the downside, only about a third of applications are decided within the standard 8 week timeframe, so you should prepare for a wait of around 3 to 4 months. The good news is that if your application is refused, you have a reasonable chance of success on appeal, with 42% of refused applications ultimately being overturned.

Local Planning Considerations

High Peak contains several areas of natural beauty and heritage value, including parts of the Peak District, so conservation areas and protected landscapes are particularly important considerations here. Many properties in the authority fall within green belt or have other environmental protections, which can affect what types of development are permitted. Before you start your project, it is worth checking whether your property has any special designations that might restrict your plans.

Tips for Homeowners

Start by having an informal chat with the planning team at High Peak before submitting your application, as they are often willing to offer guidance on whether your project is likely to be acceptable. Since decisions take longer than the standard 8 weeks here, factor in extra time for your project timeline and do not assume you will have approval quickly. Pay particular attention to how your proposal fits with the local character and any heritage features, as these seem to be important to the authority's decision making. Finally, make sure your application is as complete and professional as possible from the start, with clear drawings and a well thought through explanation of your project, as this helps officers process applications more smoothly.

About the performance rating: The score out of 100 is calculated from three factors: householder application approval rate (up to 40 points), the percentage of decisions made within the 8-week statutory target (up to 30 points), and the appeal overturn rate, where a lower rate means the authority makes sound decisions that hold up on appeal (up to 20 points). A further 10 points are available for data completeness. Source: MHCLG PS2 planning statistics and Planning Inspectorate appeal decisions, 2025 Q1-Q4.