High Peak

East Midlands·E07000037·Data: 2025 Q1-Q4
52

Average

Performance rating out of 100, based on approval rate, decision speed and appeal outcomes

High Peak is a planning authority in the East Midlands that covers a diverse area with both urban and rural communities. The authority has a relatively positive approach to householder applications, approving the vast majority of requests. One thing to be aware of is that decisions can take longer than the standard eight week target, so patience is important when submitting your application.

Approval Rate

90%

of householder applications approved

Decided Within 8 Weeks

34%

meet the statutory target

Appeal Overturn Rate

42%

of refusals overturned on appeal

What to Expect

You can feel reasonably confident about your application's chances here, as High Peak approves around 90% of householder planning applications. However, you should be prepared for the process to take some time, as only about a third of applications are decided within the standard 8 week timeframe. This means you might experience a longer wait than you would elsewhere, but the authority does generally take a favourable view of householder requests. If your application is refused, there is some hope in the appeal process, with around 42% of appeals succeeding.

Local Planning Considerations

The High Peak area includes parts of the Peak District and surrounding regions, so you may need to consider whether your property falls within a conservation area or has other heritage protections. Green belt restrictions are also relevant in parts of this authority, which can affect what type of development is possible. Before you apply, it's worth checking your property's specific location and any local designations that might apply.

Tips for Homeowners

Start by having a thorough conversation with the planning authority's pre application advice service, as this can help you understand any local sensitivities and increase your chances of success. Make sure your application is as complete and clear as possible from the start, with good quality drawings and supporting information, since this helps speed up the decision process. Finally, do prepare yourself for a longer than average wait and build this into your project timeline, so you are not caught out by delays in receiving a decision on your application.

About the performance rating: The score out of 100 is calculated from three factors: householder application approval rate (up to 40 points), the percentage of decisions made within the 8-week statutory target (up to 30 points), and the appeal overturn rate, where a lower rate means the authority makes sound decisions that hold up on appeal (up to 20 points). A further 10 points are available for data completeness. Source: MHCLG PS2 planning statistics and Planning Inspectorate appeal decisions, 2025 Q1-Q4.