Ealing

London·E09000009·Data: 2025 Q1-Q4
55

Average

Performance rating out of 100, based on approval rate, decision speed and appeal outcomes

Ealing Council covers a large area of West London and handles planning applications with a fairly permissive approach, approving around 9 out of 10 householder applications. The authority is generally supportive of residential development, though it's worth noting that decision times can be longer than the standard target.

Approval Rate

89%

of householder applications approved

Decided Within 8 Weeks

41%

meet the statutory target

Appeal Overturn Rate

19%

of refusals overturned on appeal

What to Expect

You have a good chance of getting approval for your householder planning application in Ealing, with an 89% approval rate. However, be prepared for a potentially longer wait than the standard 8 weeks, as only around 4 in 10 applications are decided within this timeframe. If your application is refused, you do have a reasonable prospect of success on appeal, with around 1 in 5 refusals being overturned. It's worth building extra time into your plans to account for the decision process.

Local Planning Considerations

Ealing includes several conservation areas where there are stricter rules about what you can do to the outside of your property, so check whether your home falls within one before you apply. Parts of the authority also fall within the Metropolitan Green Belt, which has specific protections. It's always worth checking the planning history of your property and its immediate surroundings, as this can affect what's possible.

Tips for Homeowners

Take time to understand your local planning policies before you submit, as this can help you design a scheme that fits with what the council is likely to support. Getting pre application advice from the council is a smart move and can help you avoid costly mistakes. Make sure your application is thorough and well presented, as this can help speed up the decision process. Finally, factor in a longer timescale than 8 weeks when planning your project, so you're not caught out by delays.

About the performance rating: The score out of 100 is calculated from three factors: householder application approval rate (up to 40 points), the percentage of decisions made within the 8-week statutory target (up to 30 points), and the appeal overturn rate, where a lower rate means the authority makes sound decisions that hold up on appeal (up to 20 points). A further 10 points are available for data completeness. Source: MHCLG PS2 planning statistics and Planning Inspectorate appeal decisions, 2025 Q1-Q4.